For Motor Production,Turn to Wind Automation!

 

Major in Motor Winding,Welding and Testing

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsTrickle Impregnation Machine

Output 700pcs Per 8 hours Starter Armature Roll And Dip Machine Motor Impregnation

Certification
Good quality Needle Winding Machine for sales
Good quality Needle Winding Machine for sales
We trust you and have very good references of you from our Shanghai colleagues

—— Olayo Delgado

We are very happy with the machines!

—— Efrain.Alvarado

I'm Online Chat Now

Output 700pcs Per 8 hours Starter Armature Roll And Dip Machine Motor Impregnation

China Output 700pcs Per 8 hours Starter Armature Roll And Dip Machine Motor Impregnation supplier

Large Image :  Output 700pcs Per 8 hours Starter Armature Roll And Dip Machine Motor Impregnation

Product Details:

Place of Origin: China
Brand Name: WIND AUTOMATION
Model Number: WIND-ZDG152-60

Payment & Shipping Terms:

Minimum Order Quantity: 1pc
Price: Negotiable
Packaging Details: Bare package put in a 20'GP container
Delivery Time: 60 working days
Payment Terms: T/T
Contact Now
Detailed Product Description
Condition: New Working Station: According To Armature Yield Per Shift
Impregnation: Roll And Dip Machine Color: White Or Accordingly To Customer Requirement
Power Source: Electricity After Sales: Machine Almost No Need Maintenance
High Light:

vacuum drying oven

,

varnish impregnation machine

Starter Armature Roll and Dipping Machine Motor Impregnation WIND-ZDG152-60

 

 

 

Application:

 

Starting motor armature 

 

 

 

Competitive Advantages:

 

1.Fully automatic, operator only need to load and unload armature

 

2.Rolling and dipping device is at top layer of machine,easy to adjust and maintain

 

3.Centrifigution exhausting blower suck the exhausting gas,Environment friendly

 

 

 

Example of  one Armature roll and dip Machine proposal:

 

General Output Qty around 700pcs/8hours (get 100pcs in first 2hours and 100pcs in each following
 
hours)
 
1. Chain pitch P=152.4mm, Chanin  roll and move in guiding roll
 
2. Working station: 60pcs(both side 120pcs workpiece)
 
    Loading/unloading 8, preheating 9, air cooling 2, rolling and dipping 1, flow 2, curing 38
 
3. Fast inserted fixture
 
4. Rolling and dipping device is at top layer of machine, easy to adjust and maintain
 
5. Workpiece self  rotate before the rolling and dipping station, self rotate is drive by double chain with
 
    Pitch P=15.875
 
6. Heating tunnerl use to keep the heat, and  inspection door at side of machine with double layer
 
    temperature keeping door
 
7. The cycle time, rolling and dipping time can be set on touch screen
 
8. Use electrical heating pipe with hot air blow device,temperature 150℃ adjustable
 
    There is pre-heating,colloidize, post curing  four are for heating, the heating pipe is flyer shape
 
    and life time is long
 
9.The temperature contoller is can set and show temperature in different area of tunner and alarm if
 
   overheating
 
10. Centrifigution exhausting blower suck the exhausting gas of loding/unloading , rolling and dipping area
 
11. PLC :Omron, Touch screen: Weiven Time relay : LG
 
12.Three phase 380V/50Hz, To tal power:35KW
 
 

 

Parameter:

 

Working position: 60*2

 

Position pitch: 152.4mm

 

Heating time: ≤45 min

 

Tunnel working temperature: 0 to150 ℃

 

Pitch time: 0-10min adjustable

 

Power consumption: 36 KW

 

Dimension: 6.2*1.15*2.1

 

Weight:Around 4.2 Ton

 

Production capability: 700pcs/8 hours

 

 

 

Please click below picture to view machine apperance video

https://youtu.be/_Y9Fqj05QX4

 

 

 

Contact Details
Shanghai Wind Automation Equipment Co.,Ltd

Contact Person: Ms. Emily

Send your inquiry directly to us (0 / 3000)